120 Meter-Wide Highway Ring

[vc_row][vc_column][vc_column_text] This 120 m-wide, 38 km-long ring road project was added to Erbil’s master plan in 2005. Construction began in early 2013 and was completed in four years and two months, three months ahead of schedule. This is the outermost of the ring roads that circle the city. [/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_gallery interval="3" images="5613,5616,5619,5622" img_size="large"][/vc_column][/vc_row] 120 Meter-Wide Highway Ring

150 Meter-Wide Highway Ring

[vc_row][vc_column][vc_column_text] Ebril’s 150 m-wide, 70 km-long highway ring is Hemn Group’s major new project. The first stone was laid by KRG Prime Minister Nechirvan Barzani on 26 September, 2018. The ground-breaking 14 km first section, including three interchanges and underpasses, links Baharka Road and Koya Road. The completed highway ring will connect outlying towns and... 150 Meter-Wide Highway Ring

Erbil – Duhok Highway

[vc_row][vc_column][vc_column_text] This highway connecting Ebril, the capital of the Kurdistan Region, to the city of Duhok is Hemn Group’s major new project. This ground-breaking 38 km-long highway will start from Baharka road and join the existing highway in the city of Gupal/Duhok, with the entire project expected to take three-and-a-half years to complete. [/vc_column_text][/vc_column][/vc_row] Erbil – Duhok Highway